Welcome To Blastco Incorporated

Port of Houston  

Blastco is currently removing and replacing the protective coatings to approximately 85,000 square feet of wharf sheet piling for the Port of Houston.  The new coating that is being applied is a 100% solids Chevron product that requires plural component spray application.  Due to access requirements this product has to be sprayed through 300 feet of heated line maintaining 150 degrees F to the mixing head and gun.  The longest hose length the product was sprayed through before this project was 50 feet.  Blastco custom built the pump to meet the requirements of the project.  Blastco also fabricated barges for work access and blast containment specifically for this project.  Blastco is completing this project with no interruptions or shut downs to the Port of Houston Operations which is one of the busiest in North America.

 
3mm gallon elevated water storage tank

3mm gallon elevated water storage tank for the city of Dallas. This job consisted of blasting the 63,000 sq.ft interior and applying a 10 mil 99.97% zinc metalizing lining system. It is the first of its kind in the southern United States using the very long life metalizing system.

Fuel Storage Tank, Altus Air Force Base  

Altus AFB OK, 43’x43’ fuel storage tank for JP8 jet fuel.  Job completed in 2006.


 
Lower Colorado River Authority Coal fired power plant

LCRA (Lower Colorado River Authority) Coal fired power plant  at the Flue Gas Desulphurization facility in LaGrange, TX. We are relining the failed reinforced vinylester system using a Plasite 4301 glass reinforced system at 40 mils dft. The original system lasted over 10 years and was fatigued by chemical and thermal attack from normal operation